Installation of Process Chiller

Location: Kraft Foods

Equipment: Trane 60 Ton CGAM – Air-Cooled Chiller

Description of Job:Galgon HVAC received a service call and verified that the existing chiller had failed. Since the existing chiller is critical to Kraft’s process; Galgon HVAC and Kraft’s Engineering Group jumped into action with a plan. We install hot taps and isolation valves into the plant’s main chilled water piping. We installed temporary piping to get the production process cooling back in operation. This temporary repair allowed production to continue until a new process chiller could be installed. Kraft Engineering Group and Galgon HVAC coordinated the delivery of equipment with the production shut down schedule. Other preparations were made prior to the equipment arrival and the chiller was installed during the scheduled shut down.